St. Lucie County — City of Port St. Lucie

Event production in Port St. Lucie
where the limit belongs to whoever is listening

Port St. Lucie's noise chapter does three things that together decide what can be built here, and none of them is a curfew. It sets the limit by the land use of the property receiving the sound rather than the one making it. It legislates a C-weighted ceiling alongside the A-weighted one, five decibels apart in every cell of the table. And on Sunday and on holidays it applies the overnight limits for the whole day. Read with the zoning section that actually issues the permit, those three sentences rule out more Sunday shows in this city than any curfew in the programme.

01 — The limit is the receiving property's, not yours

Chapter 94 measures at the receiving line and applies the receiving category

Title IX General Regulations, Chapter 94 Noise, section 94.04(b) and (d).

Port St. Lucie files its sound standard in Chapter 94 of Title IX, and the chapter opens by claiming everything: its provisions apply to the control of all sound originating within the city. What follows is a short chapter that spends its length on one idea, stated twice because it is easy to misread the first time.

Subsection (b) says no person shall operate a source of sound in such a manner as to create a sound level exceeding the limits in Table I for property in the receiving land use category, when measured at or beyond the approximate real property line of the receiving property. Subsection (d) says it again from the other direction: sound projected from one land use category into another land use category with a different limit shall not exceed the limit of the receiving land use category.

Both halves of that matter, and they are separable. The measurement point is the receiving property's line — not the source's line, which is how Stuart reads private ground eighty-five miles north. The applicable number is the receiving property's category — not the category the stage is standing in. A show on general commercial ground that backs onto houses is not a commercial job with a commercial allowance. It is a residential job, assessed at the fence line of the nearest house, and the commercial zoning under the stage buys nothing at all.

Subsection (f) closes the obvious way around it. Where a property's preexisting land use category carried a more restrictive limit than the category later established for the same property, the preexisting limits still apply. Land rezoned out of residential keeps the residential ceiling. A site cannot be made louder by being reclassified.

Setting the limit by the receiving land use is not by itself unusual, and this site has already written up three cities that do it — Boynton Beach, Coral Springs and Davie all measure at or within the receiving line. What those three have that Port St. Lucie does not is a measurement period. Boynton Beach's limit is one a level may exceed for up to a tenth of a sampling window with a ten-minute floor; Davie's tolerates half of one. Chapter 94 contains no equivalent anywhere in its nine sections. There is no averaging window, no percentile and no minimum duration — the figure in Table I is a ceiling the sound may not reach, not an average it may not exceed.

That is a harder standard than it looks, and it is why a Port St. Lucie design cannot be built around a loud chorus and a quiet verse. Where a ten-minute window forgives a peak, an instantaneous ceiling does not: the loudest moment of the loudest song is the compliance case, and the system has to be dimensioned for that moment rather than for the set.

Then one word in the definitions moves the receiving line indoors. Port St. Lucie and Sunrise define real property line in the same model language, down to the vertical plane extension that makes the boundary a wall rising without limit rather than a mark on the ground. The two codes part on the final clause. Sunrise's definition excludes intrabuilding real property divisions. Port St. Lucie's includes them.

One word, and it relocates the compliance surface. In a multi-tenant building — a shopping centre suite, a leased unit in a business park, a hotel function room beside a tenancy that is not yours — the demising wall is itself a real property line under this chapter. An indoor event there has a receiving line a few feet from the stage and another one overhead, and the limit that applies at it belongs to whatever the neighbouring unit is used for. The same room in Sunrise has neither.

02 — Sunday runs all day on the overnight numbers

One subsection moves the whole weekend

Section 94.04(g). Eighteen words, and the most consequential sentence in the chapter.

Table I is split by clock in the ordinary way: one column for 7:00 a.m. to 11:00 p.m., a lower one for 11:00 p.m. to 7:00 a.m. Then subsection (g) detaches the lower column from the clock entirely:

For any sound projected at any time on Sunday or a holiday, the sound level limits set forth in Table I for the time between 11:00 p.m. and 7:00 a.m. shall apply.

Not Sunday night. At any time on Sunday. A two o'clock Sunday afternoon festival in Port St. Lucie is governed by the figures the rest of the week reserves for the middle of the night, and so is every public holiday. On residential-receiving ground that is 55 dBA and 60 dBC at the receiving line, in daylight. There is no event carve-out inside Chapter 94 that lifts it — section 05 below is about the only instrument that does, and it is not the special event permit.

The city's own parks booking rules land on the same day from a completely different direction. The Parks & Recreation reservations page states that Sunday pavilion reservations are not available at Veterans at Rivergate Park, Veterans Memorial, Tom Hooper River Deck, or Rivergate Boardwalk — four riverfront sites, Sundays excluded, in a sentence that has nothing to do with sound. Two unrelated parts of the city's published record arrive at the same conclusion about the same day.

Table I's 11:00 p.m. — 7:00 a.m. column is the night standard on an ordinary weekday.

Section 94.04(g) applies that column to all sound projected at any time on Sunday or a holiday.

A Sunday matinee and a Tuesday midnight load-out are therefore held to the same figures.

Separately, four riverfront city sites publish no Sunday pavilion availability at all.

In Port St. Lucie, Sunday is not the easy day. It is the day the code treats as night, which is why a Sunday date here is a system and site decision taken at booking rather than a scheduling preference settled later.

03 — The low end is legislated, and it is the binding figure

Every cell of Table I carries a dBC limit five decibels above its dBA limit

Table I, as amended by Ord. No. 16-08, § 3, 22 February 2016.

Several cities on this site legislate the C-weighted curve as well as the A-weighted one, so a dBC figure in a table is not in itself the finding. The finding is the gap between the two numbers. Port St. Lucie prints both in every cell:

Residential: 60 dBA / 65 dBC from 7:00 a.m. to 11:00 p.m., and 55 dBA / 60 dBC overnight. Commercial: 65 dBA / 70 dBC by day, 60 dBA / 65 dBC overnight. Industrial: 65 dBA / 70 dBC, both periods. Measurements are to be made using the A-weighted or C-weighting network in accordance with ANSI standards, which puts the choice of scale with the officer holding the meter.

The gap is five decibels in every cell, without exception. Set that beside Hollywood, whose code holds the two scales to a single figure at every tier and grants no spread at all. Both cities legislate both curves; only one of them grants headroom for low frequency, and the grant is five decibels everywhere.

Five is a narrow allowance for the difference between a C-weighted and an A-weighted reading of the same programme, and it narrows further with exactly the material a concert system exists to reproduce, because C-weighting is the curve that stops discounting the low end. A spoken-word event sits comfortably inside five decibels of spread. A band with subwoofers reaches the C-weighted ceiling while the A-weighted figure still has room in it, which means the A-weighted column is never the number that stops the show.

So on a Port St. Lucie plot the dBC column is the design constraint and the dBA column is a formality. Compliance is won by controlling what the subwoofers do at the neighbouring property line — cardioid and end-fire arrangements, pattern control in preference to box count, low end distributed rather than stacked in one place — and those are rigging and truck decisions taken before the system leaves the shop, not gain decisions taken at a console on the day.

04 — Plainly audible at a hundred feet, with no meter involved

A second test sits beside the table, and amplified sound on a public street fails a third

Sections 94.04(i) and 94.06(b)(1).

Subsection (i) adds a standard that needs no sound level meter and no reference to Table I at all: noise which is plainly audible at a distance of one hundred (100) feet or more in any direction from the source of the noise shall constitute a violation of this chapter — and it names what it has in mind, including amplified sound, on private property, public property or public right-of-way alike.

A hundred-foot audibility test is familiar; Aventura runs one from the structure the sound comes out of. Whether such a test bites depends on how the code defines its adjective, and the three cities here define it three ways. Aventura narrows it, to noise that is unreasonably loud, raucous or jarring. Sunrise takes the wide model definition — any sound detectable by unaided hearing — and stops there, with no content test of any kind. Port St. Lucie takes the same wide definition and then adds a worked example to it: detection of the rhythmic bass component of the music is stated to be sufficient to verify plainly audible sound, and the listener need not determine or be able to discern the title or the specific words.

Detection, not disturbance — and the thing the drafters chose to name as sufficient is the bass. That is the second time in one chapter that this code reaches specifically for low frequency: once as the C-weighted column in Table I, once as the illustration in the definitions. Sunrise's version of the same definition names nothing. Port St. Lucie's names the one component a subwoofer exists to produce, which is about as clear a statement of what a city is actually regulating as a code ever gives.

Read literally, and it is written to be read literally, no concert system can satisfy subsection (i). That is not an oversight; it is what makes the relief instrument in section 05 structural rather than optional. An event can be entirely inside Table I at every receiving property line and still be in violation under (i), because the two tests measure different things and the code applies both.

Section 94.06 then adds a flat prohibition for the one surface a street festival is built on. Among the specific prohibitions is the operating or amplifying of any radio, tape player, or other mechanical or electronic sound making device or similar device which produces or reproduces sound on the public rights-of-way in such a manner as to be plainly audible to any person other than the operator of the device. Not a hundred feet. Audible to anyone but the operator. On a closed street in Port St. Lucie that is a prohibition on the public address system itself, not a limit on how loud it runs.

05 — There is no special-event exemption, and the relief is a police permit

Section 94.05 lists thirteen exemptions and an event is not among them

Sections 94.05 and 94.07.

The exemptions in section 94.05 are worth reading in full precisely because of what is absent. They cover safety signals and warning devices; authorised emergency vehicles; emergency work; aircraft; motor vehicles as governed by state statute; a named list of electrical and gas utilities existing and in operation on 18 July 1991; industrial-zoned land in operation on that same date; routine maintenance of residential or commercial uses between 7:00 a.m. and 10:00 p.m.; church bells and chimes; permitted mining within the hours of its permit; railways and shipping; permitted night construction; and park maintenance authorised by the park superintendent.

A concert is not there. A festival is not there. A city-sponsored event is not there. This is where Port St. Lucie parts company with most of the programme — in Stuart a permitted special event is exempt from the decibel limits by operation of the noise ordinance itself. Here the only door is the last one on the list, subsection (p): any other noise resulting from activities of a temporary duration permitted by law and for which a license or permit therefor has been granted by the city in accordance with section 94.07.

And section 94.07 is a separate instrument, applied for separately, from a different office. Applications for a special noise permit are made in writing to the chief of police, or his designee, on forms provided for that purpose. Holding a special event permit does not move the decibel limits in this city. The noise permit does, and the police department issues it.

The grant is conditional and the conditions are substantive. The chief shall grant it on finding that additional time is needed to bring the activity into compliance, or that the activity will be of a temporary duration and cannot be done in a manner that would comply — and, in both routes, that no reasonable alternative is available to the applicant. For a show, that is an evidential burden about the site and the system, not a box.

Three further terms shape the plan. Every condition the permit was granted on must be written on its face, and the code's open list of what those conditions may be runs past the date, the hours and the place to two that reach the rig: a ceiling on the sound level, and a limitation on the equipment itself. The chief of police may cap what is in the air, not merely how hard it is driven. No special permit shall be issued for a period in excess of ten consecutive days, renewable on a finding that the reasons for it still exist. And it may be cancelled or revoked at any time where that is necessary to eliminate the adverse effects it has created. That clause is not unique to this city — Deerfield Beach carries the same model language sixty miles south — but what is unique here is that it is the only route an event has, because section 94.05 offers none.

Table I binds at every receiving property line, with the dBC figure governing anything with low end.

Section 94.04(i) makes sound plainly audible at 100 feet a violation on its own terms.

Section 94.06(b)(1) prohibits amplified sound on a public right-of-way that is audible to anyone but the operator.

Section 94.05 exempts no event of any kind; subsection (p) points at a section 94.07 permit instead.

That permit is issued by the chief of police, may limit the equipment as well as the level, and is revocable at any time.

In Port St. Lucie the special event permit does not authorise the sound. A separate police permit does, and it is the item on the critical path that the zoning code never mentions.

06 — The special event permit is a zoning instrument

Section 158.225 lives in the Zoning Code and is issued by Code Compliance

Title XV Land Usage, Chapter 158 Zoning Code, Article XI, section 158.225, as amended by Ord. No. 26-52, adopted 8 June 2026.

Which chapter a city keeps its event rules in has mattered on every page here, for the plain reason that the filing address is also the issuing department. Port St. Lucie keeps them in the Zoning Code, as a supplementary use regulation, under the heading Outdoor Sales and Special Events — and the application goes to the Code Compliance Division of the Building Department. Not parks, not the clerk, and not the police, who hold the other two instruments this show needs.

The trigger is a use test rather than a headcount. A permit is required for any temporary outdoor special event or outdoor sales which is not one of the permitted uses of a property and not included as a customary primary or ancillary use, and any use already included in the business tax receipt as a use for the property will not require a separate temporary event permit. Where Stuart counts people and triggers at twenty-five, Port St. Lucie asks whether the property is already entitled to do this. A venue whose tax receipt covers the activity is outside the section entirely.

The applicant must be the owner or its agent of the land, which rules out a producer applying in their own name on someone else's ground. The section was last amended in June 2026, so it is a live instrument rather than a dormant one.

07 — A city park needs no special event permit at all

Four categories are carved out of section 158.225 by name

Section 158.225, opening paragraph.

The section's own first paragraph excludes four things from the permit requirement: church festivities held on church property; events held at City parks or recreation facilities; the display of merchandise at the entry to retail establishments; and community days annual events.

The second of those is the one that reshapes a Port St. Lucie plan. An event at a city park or recreation facility does not require a special event permit under section 158.225. There is no area test, no duration test and no attendance test attached to it — compare Stuart, where a park event escapes the permit only if it is wholly within the park, occupies no more than half its area, runs no more than six hours, and is not a series. Here the carve-out is unqualified in the section itself.

What it does not do is touch anything else. The park booking is still a booking, made through Parks & Recreation on their own terms. Chapter 94 still applies in full — the carve-out is in the zoning code, not the noise chapter, and a park has receiving property lines like any other parcel. The tents still need the county fire district's statement. The practical effect is to remove one department from the critical path, not three.

The booking terms are themselves specific, and counterintuitive in one respect. Pavilion reservations can be made by 8:00 p.m. the day prior for next-day use where payment and paperwork are in. Neighborhood parks accept reservations up to 180 days in advance. Community parks' playing fields and pavilions may only be reserved up to 90 days in advance — the larger category has the shorter horizon, which is the opposite of what a planner working backwards from a date would assume.

08 — Four zoning categories, and the quietest one is missing from the list

An outdoor event may not be permitted on industrial land, which is the only category the noise table treats generously

Section 158.225(C)(1) read against Table I.

Subsection (C)(1) says where an outdoor event may happen. Events under the section — including but not limited to circuses, carnivals, tent revivals, outdoor exhibitions, road festivals, and organized competitive events — shall be permitted on developed property zoned open space recreation, institutional, general commercial and planned unit development or master planned unit development.

Four categories, and industrial is not one of them.

Set that beside Table I. Industrial is the single category in the noise table with no night step-down at all — 65 dBA and 70 dBC at every hour, where commercial drops five decibels at eleven and residential drops five more. It is, on the face of the table, the most forgiving ground in the city for a late show. And it is the one category on which the zoning code does not permit an outdoor special event to be held.

The two sections are in different titles of the code and neither cross-references the other, so the interaction is only visible if both are read. It is worth stating plainly because the inference a planner would otherwise draw — find industrial ground, inherit the loosest limits — is unavailable in this city, and finding that out late costs a site.

Table I gives industrial land 65 dBA / 70 dBC in both the day and the night period, with no step-down.

Section 158.225(C)(1) permits outdoor special events on open space recreation, institutional, general commercial and PUD/MPUD land.

Industrial land does not appear in that list.

The permitted categories all carry either the commercial limits or, where they adjoin housing, the residential ones at the receiving line.

The most permissive numbers in the noise table attach to the one category where the zoning code will not permit the event. Site selection in Port St. Lucie is therefore a search for permitted ground with distant receiving lines, not for a generous zone.

09 — Seven consecutive days, four a year, then a council vote

The cap is on the property, not on the organiser

Section 158.225(C)(1).

The same subsection sets two ceilings in one sentence. An outdoor event shall not be permitted to exceed seven (7) consecutive days, and no more than four (4) such events per year shall be permitted on the same property. The second limit may be waived by affirmative vote of the City Council, and nothing waives the first.

The four-a-year cap attaches to the property. A site that has already hosted four permitted outdoor events in a calendar year is closed to a fifth whoever is asking, and reopening it is a council agenda item with a council calendar behind it. For a promoter building a recurring series on one piece of ground — a monthly on the same lot, a quarterly at the same shopping centre — that is a hard structural limit discovered at the venue rather than at the application, because the count belongs to a parcel's history and not to anything the applicant has done.

Seven consecutive days is the whole occupation and not the show days, which puts the build and the strike inside it. A four-day festival with a two-day build and a one-day strike is at the ceiling exactly.

10 — A street closure is the clock, and it has a ceiling as well as a floor

Not less than thirty days nor more than three hundred and sixty-five, filed with the chief of police

Chapter 99 Parades, and section 158.225(C)(4).

Section 158.225 sets no application deadline of its own. The only lead time it names attaches to staffing: where police services determine that off-duty officers are required for traffic or crowd control or for security, payment for their services must be made at least fifteen (15) days prior to the first day of the event. That is a payment deadline, not a filing one, and it is the only clock in the section.

The real clock is in a different chapter. Subsection (C)(4) states that all events requiring public street closures shall make application for a street closure permit per Chapter 99 with the City's Police Department prior to issuance of a permit — the closure first, the event permit after. And Chapter 99 sets the filing period: an application for a street closure permit shall be filed with the chief of police not less than 30 days nor more than 365 days prior to the date on which it is proposed to conduct the event.

The lower bound is ordinary. The upper bound is not. A street in Port St. Lucie cannot be reserved more than a year out, which means an annual event cannot hold its date by filing early, and a tour routing more than twelve months ahead cannot secure the street at the time the routing is set. The date exists in the police department's hands for a window that opens one year before the show and closes thirty days before it.

Three instruments, three sequences, and the police department holds two of them: the street closure under Chapter 99, the noise relief under section 94.07, and the special event permit from Code Compliance, which cannot issue until the closure has. Where a state or federal agency is a consenting party elsewhere in the programme — Jupiter, Sunrise and Deerfield Beach all deal with that — here the sequencing is internal to the city, and it is the internal order that has to be got right.

11 — Twenty-four hours to put it back

The restoration deadline is written into the zoning code twice

Section 158.225(A)(1) and (C)(5).

The requirement appears in the application documentation and again in the outdoor events subsection, in the same words: the area utilized shall be cleaned daily and following any special event shall in all respects be restored to its former condition within twenty-four (24) hours after the close of the event. Covered dumpsters and trash containers must be provided on the event site and emptied daily.

A twenty-four hour restoration deadline is a load-out schedule stated as a planning condition, and it is the clause that decides crew size on a Port St. Lucie build more than any other. It is a window to strike and make good, which on grass includes the ground, and it starts when the show ends rather than when the site is clear. Where the close of the event falls late on a Saturday, the deadline runs into a Sunday that section 94.04(g) has already put on the overnight limits, which constrains what plant can be running while the work is done.

Compliance is secured financially: the section requires a refundable security deposit, payable in advance, scaling with each day of the event, held as security that the premises will be cleaned of all rubbish and debris. Whether that deposit returns is decided inside the twenty-four hours.

12 — The fire authority is the county, not the city

St. Lucie County Fire District signs the tents, the effects and the food trucks

Section 158.225(A)(2), and the MIDFLORIDA Credit Union Event Center's own event planning guide.

Among the documents an application must carry to be processed is a written statement from the St. Lucie County Fire District that the tents or temporary structures under which the event is to be held are of fireproof material and will not constitute a fire or egress hazard. The city's permit depends on a county document, and the county keeps its own queue.

The same authority reaches further than the tents. The city's own event centre publishes that outdoor tents and canopies exceeding 300 square feet require a permit from the Fire Marshal; that the use of open flame devices is regulated by the St. Lucie County Fire Marshal's Office; that a special permit is required for pyrotechnics and lasers, each situation individually pre-approved and continuously monitored, with a demonstration of the effects possibly required on the premises and standby fire personnel possibly required at the customer's expense; and that a fire watch may be required for hazers and fog machines. It also states that floor plans may be submitted to the St. Lucie County Fire Marshal for approval, and that those plans must show the location and dimensions of all fixtures including stages, registration areas and entertainment areas.

Two further county touchpoints: food vending trucks must be inspected by the St. Lucie County Fire District prior to an event, and on-site emergency medical personnel may be required through the St. Lucie County Fire District. A haze cue, a stage position, a food truck and a medic all answer to the same county office, which is a single lead time rather than four if it is identified early and four if it is not.

The flame-resistance rule is stated at the level of the materials rather than the structure: all woodwork, stage scenery, furnishings, decorations and sets used upon a working permanent or temporary stage, or within an exhibit, shall be coated or treated by approved methods to render them flame resistant. That reaches set dressing and soft goods, not just the tent.

13 — What the city's own event centre publishes

A full room schedule, three exclusivities, a twelve-foot dock — and no ceiling height anywhere

MIDFLORIDA Credit Union Event Center, 9221 SE Event Center Place, from its own published event planning guide.

The city's event centre is a 100,000 square foot facility and it publishes a 34-page planning guide with a complete room schedule in it, which makes it one of the better-documented buildings this programme has read.

The interior divides into two halls. Emerald Hall is 13,464 square feet at 143.55 by 93.79 feet, seating 1,400 theatre style, 600 banquet, 486 classroom, and taking 74 booths; it splits five ways, with Emerald 1 at 5,406 square feet and the smallest at 1,377. Ruby Hall is 5,790 square feet at 56.77 by 102 feet, 450 theatre style, and splits five ways as well. Alongside them: a 6,420 square foot lobby at 130 by 49 feet, a 1,901 square foot art gallery, and a 12,544 square foot gymnasium at 128 by 98 feet.

The exterior spaces are published to the same resolution and they are substantial: Village Square at 98,825 square feet, 300 by 160 feet; a front plaza of 30,264 square feet at 230 by 130; a flat lot of 68,991 square feet; a 3,600 square foot rear boardwalk; and a garage at 46,800 square feet per floor, 188 by 249 feet.

What is not published anywhere in the guide is a ceiling height, a trim height or a rigging capacity for any room. The only vertical dimension in thirty-four pages is a service one: loading dock height clearance, 12 feet. For a building that publishes five-way room splits to two decimal places, the absence of a single trim height is the thing to plan around — on this site the hanging plot is a site-visit question, not a document question, and it should be asked in the first call rather than the last.

Three exclusivities and one scoping sentence change what a production can bring. Ceiling banners must be hung by venue staff. The caterer is the holder of the facility's alcohol beverage licence and has exclusive pouring rights; an outside caterer is permitted for food service only. And the guide is unusually candid about its own audio: house sound has the capability to provide sound for meetings and general announcements, and customers organising an entertainment event with highly specialized requirements should contract with an outside vendor best suited to meet the needs of the event. It then adds the sentence that matters most to a rigger: some events may be required to "fly" sound and/or lighting depending on the available space and the type of event. The building may require a flown system — in a document that publishes no trim height.

Two further operational facts. Electrical access is standard 110V outlets; higher voltage requires advance notice, so three-phase service is an arrangement rather than a standing condition. And the venue reserves the right to regulate the audio levels of all events, on the stated ground that one event must not disturb another — which in a building that runs Emerald and Ruby concurrently is a live constraint rather than boilerplate. Load-in is through the designated loading dock or the circle drive, never the main guest entrance; vehicles are permitted in the lobby and on the front plaza but not in Emerald or Ruby Hall; and aisles must be a minimum of 4 feet with a 5 foot room perimeter, with nothing placed within 20 feet of a main entrance or exit.

14 — What else the city publishes about its rooms and its ground

One banquet hall with a stage, twenty acres of gardens, and no technical specification for either

City of Port St. Lucie Parks & Recreation facility and reservation pages.

Outside the event centre the published record thins quickly, and what remains is areas without services.

The PSL Community Center publishes an 8,300 square foot banquet hall with a stage, divisible into two to four separate rooms; two meeting rooms accommodating groups from five to 50; a full-size catering kitchen; an outside plaza area; and one scheduling fact a producer needs before anything else — weekend reservations at the Community Center are available until 12 a.m. That is a published end time on the building's own page, and it is later than the overnight threshold in Table I by an hour.

The Port St. Lucie Botanical Gardens is published as 20 acres along the North Fork of the St. Lucie River, with a lake, paved paths, a pavilion and a wedding venue, operated day to day by a non-profit rather than by the city — so its availability is a conversation with the operator, not a municipal booking.

What none of those pages publishes is the figure a crew needs. No city facility page gives a ceiling height, a service rating, a point load, a dock dimension or a vehicle route for any bookable interior or any bookable ground. The 8,300 square feet is a floor area; the twenty acres is a site area; neither tells a production what it can hang, what it can draw or how it gets a truck to the door. That is stated here rather than guessed at, and on a Port St. Lucie job it means the site visit does real work instead of confirming a document.

Where the figures come from

  • Code of Ordinances, City of Port St. Lucie, Title IX General Regulations, Chapter 94 Noise, adopted Ord. 91-43, passed 8 July 1991, effective 18 July 1991; Table I amended by Ord. No. 16-08, § 3, 22 February 2016. Section 94.01: the provisions of this chapter shall apply to the control of all sound originating within the city — Code of Ordinances Chapter 94, sections 94.01 and 94.04
  • No person shall operate or cause to be operated any source of sound from any location in such a manner as to create a sound level which exceeds the limits set forth in Table I for property in the receiving land use category when measured at or beyond the approximate real property line of the receiving property. Sound projected from one land use category into another land use category with a different limit shall not exceed the limit of the receiving land use category. Where the limits for a preexisting land use category are more restrictive than those for a subsequent land use category established for the same property, the preexisting limits apply — Code of Ordinances section 94.04(b), (d) and (f)
  • Table I, maximum noise levels in A and C-weighted decibels by receiving land use category. Residential 60 dBA / 65 dBC from 7:00 AM to 11:00 PM and 55 dBA / 60 dBC from 11:00 PM to 7:00 AM. Commercial 65 dBA / 70 dBC and 60 dBA / 65 dBC. Industrial 65 dBA / 70 dBC in both periods. Sound level measurements shall be made with a sound level meter using the A-weighted or C-weighted scale in accordance with standards promulgated by the American National Standards Institute — Code of Ordinances section 94.04, Table I, and section 94.04(h)
  • Definitions. Plainly Audible: any sound that can be detected by a person using his or her unaided hearing faculties; as an example, if the sound source under investigation is a portable or personal vehicular sound amplification or reproduction device, the detection of the rhythmic bass component of the music is sufficient to verify Plainly Audible sound, and the person need not determine or be able to discern the title or specific words. Real property line: an imaginary line along the real property surface, and its vertical plane extension, which separates real property owned, rented or leased by a person from that owned, rented or leased by another person, including intrabuilding real property divisions. Sound level: the A-weighted or C-weighted sound pressure level obtained by use of a sound level meter as specified by ANSI. Chapter 94 contains no averaging period, percentile or minimum measurement duration in any of its nine sections — Code of Ordinances section 94.02, Definitions
  • For any sound projected at any time on Sunday or a holiday, the sound level limits set forth in Table I for the time between 11:00 p.m. and 7:00 a.m. shall apply — Code of Ordinances section 94.04(g)
  • Noise which is plainly audible at a distance of one hundred (100) feet or more in any direction from the source of the noise shall constitute a violation of this chapter, including but not limited to amplified sound and self-contained, portable, hand-held music or sound amplification or reproduction equipment operated on private property, public property, or public right-of-way — Code of Ordinances section 94.04(i)
  • Specific prohibition: the operating or amplifying of any radio, tape player, or other mechanical or electronic sound making device or instrument or similar device which produces or reproduces sound on the public rights-of-way in such a manner as to be plainly audible to any person other than the operator of the device — Code of Ordinances section 94.06(b)(1)
  • Exemptions: safety signals and warning devices; authorized emergency vehicles; emergency work; aircraft other than power model vehicles; motor vehicles as specified in F.S. chs. 316 and 403; named electrical and gas utilities existing and in operation on 18 July 1991; land use categories zoned for industrial activities existing and in operation on that date; temporary maintenance of residential or commercial uses between 7:00 a.m. and 10:00 p.m.; church bells and chimes; permitted mining within its permitted hours; railways and shipping; permitted construction between sundown and 7:00 a.m.; park maintenance between sundown and 7:00 a.m. as authorized by the park superintendent; and any other noise of a temporary duration permitted by law and for which a license or permit has been granted in accordance with section 94.07. No exemption for special events, concerts or festivals appears in the list — Code of Ordinances section 94.05(a) to (p)
  • Applications for a special permit shall be made in writing to the chief of police, or his designee, on forms provided for that purpose. The chief shall grant the permit on finding that additional time is necessary to alter or modify the activity to comply, or that the activity will be of a temporary duration and cannot be done in a manner that would comply; and that no reasonable alternative is available to the applicant. The permit shall contain all conditions upon which it was granted, which may include the effective date, time of day, location, sound level limit or equipment limitation. No special permit shall be issued for a period in excess of ten consecutive days; renewable on application. The chief may cancel or revoke the permit at any time — Code of Ordinances section 94.07(a), (b) and (c)
  • Special events are Title XV Land Usage, Chapter 158 Zoning Code, Article XI Supplementary Use Regulations, section 158.225 Outdoor Sales and Special Events, amended by Ord. No. 26-52 adopted 8 June 2026. A permit is required for any temporary outdoor special event or outdoor sales which is not one of the permitted uses of a property and not included as a customary primary or ancillary use; any use already included in the business tax receipt will not require a separate temporary event permit. Permits are not required for church festivities held on church property, for events held at City parks or recreation facilities, for the display of merchandise at the entry to retail establishments, or for community days annual events. Application is to the Code Compliance Division of the Building Department and the applicant shall be the owner or its agent of the land — Code of Ordinances section 158.225, opening paragraph and subsection (A)
  • The area utilized shall be cleaned daily and following any special event shall in all respects be restored to its former condition within twenty-four (24) hours after the close of the event. Covered dumpsters and trash containers must be provided on the event site and emptied daily. A refundable security deposit payable in advance, scaling with each day of the event, is required as security to guarantee the premises will be cleaned of all rubbish and debris — Code of Ordinances section 158.225(A)(1) and (C)(5)
  • Required documentation includes a written statement from the St. Lucie County Fire District that the tents or temporary structures under which the event is to be held are of fireproof material and will not constitute a fire or egress hazard; and a concept plan showing the location of the special event, all structures to be utilized including tents, booths and exhibits, width of aisles, means of ingress and egress, concession areas, waste removal facilities, sanitary facilities, and utilities such as electrical and telephone facilities. Police services will review the application to determine if off-duty officers are required for traffic or crowd control or for security; where required, payment must be made at least fifteen (15) days prior to the first day of the event — Code of Ordinances section 158.225(A)(2), (A)(3) and (A)(8)
  • Outdoor events under this section, including but not limited to circuses, carnivals, tent revivals, outdoor exhibitions, road festivals, and organized competitive events, shall be permitted on developed property zoned open space recreation, institutional, general commercial and planned unit development/master planned unit development. The event shall not be permitted to exceed seven (7) consecutive days and no more than four (4) such events per year shall be permitted on the same property. The limitation of four events per year may be waived by affirmative vote of the City Council. Industrial zoning does not appear among the permitted categories — Code of Ordinances section 158.225(C)(1)
  • All events requiring public street closures shall make application for a street closure permit per Chapter 99 of the City of Port St. Lucie Code of Ordinances with the City's Police Department prior to issuance of a permit. An application for a street closure permit shall be filed with the chief of police not less than 30 days nor more than 365 days prior to the date on which it is proposed to conduct the event. The chief of police is authorized and empowered to issue a street closure permit for the temporary complete or partial closure of roads, alleys, sidewalks or any other public ways. All events containing an animal show shall make application with and receive approval from the City's animal control division before a permit will be issued — Code of Ordinances section 158.225(C)(3) and (C)(4); Chapter 99, Parades
  • An application shall be denied if the applicant has made any misrepresentations; fails to provide any of the items or information required; the special event will substantially interfere with any other special event for which a permit has already been granted or with the provision of public safety or other city services needed to support such other previously scheduled events; or the special event will have an un-mitigatable adverse impact upon residential or business access and traffic circulation in the area — Code of Ordinances section 158.225(B)
  • MIDFLORIDA Credit Union Event Center, 9221 SE Event Center Place: a 100,000 square foot facility. Emerald Hall 13,464 sq ft, 143.55 by 93.79 ft, 1,400 theater / 600 banquet / 486 classroom / 74 booths, divisible into five rooms from 5,406 down to 1,377 sq ft. Ruby Hall 5,790 sq ft, 56.77 by 102 ft, 450 theater, divisible into five. Lobby 6,420 sq ft at 130 by 49 ft. Art Gallery 1,901 sq ft at 36 by 53 ft. Gymnasium 12,544 sq ft at 128 by 98 ft. Village Square 98,825 sq ft at 300 by 160 ft. Front Plaza 30,264 sq ft at 230 by 130 ft. Flat Lot 68,991 sq ft. Rear Boardwalk 3,600 sq ft. Garage 46,800 sq ft per floor at 188 by 249 ft. No ceiling height, trim height or rigging capacity is published for any space; the only vertical figure given is a loading dock height clearance of 12 feet — MIDFLORIDA Event Center, Event Planning Guide, Appendix D Floor Plans and Room Capacities, and Appendix F Exhibitor Kit
  • House sound equipment has the capability to provide sound for meetings and general announcements; customers organizing an entertainment event with highly specialized requirements should contract with an outside vendor best suited to meet the needs of the event. Some events may be required to fly sound and/or lighting depending on the available space and the type of event. The venue reserves the right to regulate the audio levels of all events; customers must maintain an appropriate audio level so as not to disturb or interrupt other events. Ceiling banners must be hung by venue staff. Electrical access is standard 110V outlets; higher voltage requires advance notice. Load-in is through the designated loading dock or circle drive, not the main guest entrance. Vehicles are permitted in the lobby and front plaza but not in Emerald or Ruby Hall — MIDFLORIDA Event Center, Event Planning Guide, General Planning, Tradeshow Policies and Exhibitor Kit
  • The venue's catering team is the holder of the facility's alcohol beverage license and has exclusive pouring rights for the venue; an outside caterer may be used for food service only, subject to venue approval and documentation. Mobile food trucks must comply with the Florida Fire Prevention Codes and are to be inspected by the St. Lucie County Fire District prior to an event. The venue may require some events to have on-site emergency medical personnel through the St. Lucie County Fire District — MIDFLORIDA Event Center, Event Planning Guide, Food and Beverage Policy, Alcohol Beverage Policy and Mobile Food Truck Requirements
  • Aisles must be a minimum of 4 feet with a room perimeter of 5 feet; no exhibit booth, registration table or related material may be placed within 20 feet of a main entrance or exit. Outdoor tents and canopies that exceed 300 square feet require a permit from the Fire Marshal. All woodwork, stage scenery, furnishings, decorations and sets used upon a working permanent or temporary stage, or within an exhibit, shall be coated or treated by approved methods to render them flame resistant. The use of open flame devices is regulated by the St. Lucie County Fire Marshal's Office; a special permit is required for pyrotechnics and lasers, each situation individually pre-approved, strictly controlled and continuously monitored, with a demonstration of the effects possibly required on the premises and standby fire personnel possibly required at the customer's expense. A fire watch may be required for hazers, fog machines and similar special effects. Floor plans may be submitted to the St. Lucie County Fire Marshal for approval and must show the location and dimensions of all fixtures including stages, registration areas and entertainment areas — MIDFLORIDA Event Center, Event Planning Guide, Security, Fire and Safety Guidelines, and Floor Plan Approval
  • PSL Community Center: 8,300 square foot banquet hall with stage, divisible into two to four separate rooms; two meeting rooms accommodating groups from five to 50; full-size catering kitchen; outside plaza area; weekend reservations available until 12 a.m. Pavilion reservations can be made by 8 p.m. the day prior for next-day use where payment and paperwork are received; neighborhood parks accept reservations up to 180 days in advance; community parks' playing fields and pavilions may only be reserved up to 90 days in advance. Sunday pavilion reservations are not available at Veterans at Rivergate Park, Veterans Memorial, Tom Hooper River Deck, or Rivergate Boardwalk — City of Port St. Lucie, Parks & Recreation, Reservations & Rentals
  • Port St. Lucie Botanical Gardens: 20 acres along the North Fork of the St. Lucie River, with a lake, paved paths, gardens, a pavilion, a gift shop and a wedding venue; operated by a non-profit which supports daily operations and hosts events. No city facility page publishes a ceiling height, service rating, point load, dock dimension or vehicle route for any bookable interior or bookable ground — City of Port St. Lucie, Parks & Recreation, Botanical Gardens; and a reading of the city's Parks & Recreation facility and reservation pages
15 — Start here

Tell us about your event.

The date, the venue, roughly how many people, and what has to happen in the space. We will reply within 24 hours.

Phone
561-750-4070
Also
954-978-8442
Email
[email protected]
Shop
500 Northeast 28th Court, Pompano Beach, FL 33064
Follow
InstagramFacebookLinkedIn