Broward · Miami-Dade · Palm Beach · Martin · St. Lucie · Indian River · Hendry · Okeechobee · Collier · Charlotte · Lee · Monroe

Event production across South Florida
where the rules change at the city line

Each city writes its own noise limits, permit windows and load-in hours, and those are the numbers that decide what a show can do on the night. Every one we work in has a page with its own.

01 — Broward County

Broward County

Fort Lauderdale out to the western suburbs, and the beach towns north of it.

02 — Miami-Dade County

Miami-Dade County

The city, the beach, and the inland municipalities that run their own permitting.

03 — Palm Beach County

Palm Beach County

West Palm Beach south to Boca Raton, and the towns inland and north.

04 — Martin County

Martin County

The Treasure Coast begins here: a river city whose permit rules are its own.

05 — St. Lucie County

St. Lucie County

North along the Treasure Coast, where Sunday runs on the overnight limits and one city legislates the low end by name.

06 — Indian River County

Indian River County

The northern end of the Treasure Coast, where the noise chapter sets no decibel figure and a beach build changes with the turtle season.

07 — Hendry County

Hendry County

West of the lake, where the park article was rewritten in 2024 and the permit itself has to grant the hours.

08 — Okeechobee County

Okeechobee County

North of the lake, where one flat decibel figure applies around the clock and the load-out clock starts before the park closes.

09 — Collier County

Collier County

South-west Florida, where the noise ceiling is written per octave band and the special event permit does not lift it, and where the annual permit for a beach event belongs to the hotel that owns the frontage rather than to the company building the show.

10 — Charlotte County

Charlotte County

The northern edge of the south-west Florida group, where the city asks sixty days and a notarised signature, closing the waterfront path needs the City Council and detour signs the organiser makes themselves, and the largest published event space in the market sits across the harbour on an address the city permit does not reach.

11 — Lee County

Lee County

South-west Florida, where the city handbook says downtown light poles will not carry a band and publishes a power to lower the sound rather than a cutoff hour, and the city next door publishes two different permit clocks against itself.

12 — Monroe County

Monroe County

The Florida Keys, where the city will not issue a second noise exemption for the same location inside sixty days, an event that keeps to one block and finishes before nine can be signed off by the city manager while anything else goes to the Commission, and the county that governs the ground outside the city limits prohibits driving a stake into it.

13 — What changes at a city line

Twelve counties, and no two sound ordinances alike.

A permit is issued by a city, not by a county and not by the state, so a show that is straightforward in one municipality can be a different build four miles away. Sound is the clearest case. Some cities publish a decibel ceiling and a measuring point. Some publish a curfew and leave the level to the officer standing in front of you. Jupiter writes the loudspeaker system into its zoning code and can ask for the limiter's data afterwards. Homestead's ordinance names no decibel at all. Stuart sets one pair of numbers for the whole city and then moves the microphone fifty feet from the source the moment the ground is public. Port St. Lucie sets its limit by the land use of whoever is receiving the sound rather than whoever is making it, and then applies its overnight figures to the whole of Sunday.

Load-in hours move the same way, and they move the budget with them. A city that will not let a truck onto a closed street before eight in the morning turns a one-day build into an overnight one, with the crew size that implies. A city that wants the street reopened by eleven at night decides when the strike starts, which decides whether the strike is one call or two.

Then there is who signs. A beach build answers to a parks department. A street closure answers to police and to public works. An outdoor stage over a certain height answers to a building department and wants an engineer's drawing. Those departments keep their own calendars, and the one with the longest lead time sets the date by which the show has to be real.

We produce across all twelve counties, so the first conversation about a date is usually about which of these applies. Tell us the city and the room, or the field, and we will tell you what it changes.

14 — Start here

Tell us about your event.

The date, the venue, roughly how many people, and what has to happen in the space. We will reply within 24 hours.

Phone
561-750-4070
Also
954-978-8442
Email
[email protected]
Shop
500 Northeast 28th Court, Pompano Beach, FL 33064
Follow
InstagramFacebookLinkedIn