What it actually decides.
A point load is the concentrated force arriving at a single structural attachment. It is what a venue publishes limits for, because a roof structure does not experience a rig as a total weight spread evenly; it experiences a series of concentrated forces at specific nodes.
This is why the first question from a venue is never how much the rig weighs. It is how much lands on each point, and where those points are. A six thousand pound rig on twelve well-distributed points may be straightforward where the same rig on four points is not permitted at all.
Two things raise a point load beyond the obvious arithmetic. The first is uneven distribution: a motor nearer a heavy cluster takes more than its share, and a truss with an LED wall at one end does not divide its load equally between its two ends. The second is dynamic force. Starting and stopping a lift, or a load swinging as it is positioned, briefly delivers more than the static weight, which is why the static sum is a floor rather than an answer.
Bridling changes point loads substantially and almost always upwards, which is the reason a bridle is calculated rather than estimated by eye.
We own this equipment.
Staging and rigging — owned inventory, our own crew, and a site survey before anything is specified.