A building hangs it. A field stands it up.
The decision is made by the site, before anybody opens a load table.
A convention hall or a theatre has structure overhead that an engineer has already rated. The production hangs from it, and the open questions are how much weight and at which points.
A park, a beach, a closed street or a parking lot has nothing overhead. The structure arrives on the truck, stands on its own base, and carries the lighting, the video and the loudspeakers from the ground up.
Crew size, truck count, the drawing attached to the permit and the ballast all follow from which of those two the site is. So does the answer to how high the truss can go.
Global Truss prints three load tables for F34. They do not hold the same numbers.
Which table a figure came off changes what the figure means.
The F34 load span tables published by Global Truss carry three sets of allowable loads on one sheet. One is headed as limited by strength and L/180 deflection. One is strength only, with no deflection limit. One is strength reduced per ANSI E1.21, and that is the reduction that applies outdoors.
L is the span. On a thirty-foot span, L/180 allows two inches of movement at mid-span. A figure quoted without its table carries no such limit with it.
The sheet also sets conditions a load figure on its own does not carry. The self-weight of the truss is already included in the allowable loads. Shock and dynamic forces are not included. A uniformly distributed load applies only where it is spread evenly across the entire span. The loads shown are not additive.
Two further conditions decide what a venue can actually offer. Every load has to attach at a truss panel point. Bridles are not permitted unless a licensed structural engineer approves them in writing.
An offer of a couple of points anywhere along that beam is therefore not the arrangement the table describes. Global Truss states on the same sheet that the tables are for general reference only, and that a rigging plot should be reviewed by a licensed structural engineer.
One horsepower covers half a ton to three tons. The chain does the arithmetic.
Capacity and trim speed trade against each other on the same motor.
Columbus McKinnon publishes its Lodestar electric chain hoists as a table of models rather than a single rating. At one horsepower the same motor size appears four times. Half a ton at 32 feet a minute on a single chain fall, one ton at 16, two tons at 8 on two falls, and three tons at 5.5 on three falls.
Half a horsepower repeats the pattern one step down — a quarter ton at 32 feet a minute, half a ton at 16, and a full ton at 8 on two falls.
A call for a one-ton motor has named a capacity and left the trim time open. Where the truss moves between acts, the feet-per-minute figure is the one that governs the schedule.
The hoist hangs as well. Columbus McKinnon publishes the three-ton model at 158 pounds and the two-ton at 131 and 130 pounds across its two voltage codes, before any of the load the hoist is there to lift. Twenty points of the three-ton model is over a ton and a half of hoist on the structure.
On the rating itself, Columbus McKinnon states that the Lodestar meets ASME B30.16 and exceeds H4 duty requirements. Each hoist is inspected and tested to over 125 per cent of rated load before it ships.
Prolyte publishes 1,000 kg for the MPT tower. The figure depends on the base.
Height and self-weight are fixed. The capacity is conditional.
Prolyte publishes the MPT tower at a maximum height of 8.00 metres and a maximum loading capacity of 1,000 kg. That capacity is conditional. Prolyte states that it depends on the tower height and size, the applied load, and how the tower base and top are restrained, and refers the reader to its own Blackbook for the detail.
The fixed figures are the ones a load-in plans around: a self-weight of 115 kg, an H30V mast section and a CCS6 coupling system in EN-AW 6082 T6 aluminium. The maximum handwinch load is published at 750 kg.
The sleeve block takes 30 and 40 series truss on all four sides through bolted couplers, and S36R or S36V truss through an adapter plate. Prolyte describes the block as fully bolted rather than welded.
A hung point inherits a rating somebody calculated for the building years ago. A tower carries a rating the crew completes on site, through the base, the restraint and the ballast. That gap is where the engineering drawing for a permit comes from.
ANSI E1.21 covers the structure. It states that it does not cover egress.
Two questions at a permit desk, answered by two different documents.
The standard named in that third table is ANSI E1.21, published by the Entertainment Services and Technology Association. The 2023 edition is titled Temporary Structures Used for Technical Production of Outdoor Entertainment Events, supersedes the 2020 edition, and is aligned to the 2024 International Building Code.
Its published scope is a minimum level of design and performance parameters for the design, manufacturing, use and maintenance of temporary ground-supported structures used in the production of outdoor entertainment events. The abstract states that the document does not address fire safety and safe egress issues.
A reviewer at a permit desk usually asks about both. A structural calculation answers the first. Crowd routes, exits and the fire lane are answered elsewhere in the same application, and a production that brings only the first answer goes back round.
The Global Truss sheet names the codes behind its own numbers: the 2018 International Building Code, ANSI E1.21-2020, the Aluminum Design Manual 2015 and AISC 360-16. A load figure is only as current as the documents under it.
The site is surveyed first. The table is read second.
What gets checked before either arrangement is quoted.
Indoors, the questions are the building’s own rigging capacity and where its points fall against the stage. Then whether the house holds any of the work exclusively, and whether the plot needs a bridle the truss manufacturer will not allow without an engineer.
Outdoors, the questions are the ground under the base, the ballast, the restraint at the top of the tower, the wind exposure, and the drawing the city wants attached to the special-event permit.
A park site answers almost none of that from a published table, so the survey comes first. The same stage plot can be a four-point hang in a hall and a pair of towers with ballast on a lawn.
Both arrangements finish with a truss at a trim height over a stage. The published tables say what each one carries. The site says which one is available.
Where the figures come from
- Three sets of allowable loads on one sheet — limited by strength and L/180 deflections; strength only with no deflection limits; and strength reduced per ANSI E1.21. Chord 50 mm by 2 mm (1.96″ outer diameter, 0.08″ wall) and diagonal 20 mm by 2 mm (0.79″ outer diameter, 0.08″ wall), both 6082-T6 aluminium; conical connector 2007-T4, as-machined and unwelded; pin 42CrMoS4 steel at 113 ksi tensile yield with a safety clip; weld filler 5556. Self-weight of the truss included in the allowable loads with no reduction needed; shock and dynamic forces not included; uniformly distributed loads applicable only when evenly distributed across the entire span; loads shown not additive; all loads to attach at truss panel points; bridles not permitted unless approved in writing by a licensed structural engineer; tables for general reference only and rigging plots to be reviewed by a licensed structural engineer. Referenced codes: 2018 IBC, ANSI E1.21-2020, ADM 2015 and AISC 360-16. Sheet S1.0, Rev A, dated 01/22/2020 — Global Truss, F34 Truss Load Span Tables, globaltruss.com, read on 1 November 2026.
- F34 square section SQ-4112: 6.56 ft (2.0 m) length, 11 7/16″ (290 mm) overall width, 2″ (50 mm) outer diameter main tubing at 0.08″ wall, 3/4″ (20 mm) diagonal bracing, 29 lb (13.17 kg) — Global Truss, SQ-4112 product specification, globaltruss.com, read on 1 November 2026.
- Lodestar electric chain hoist, 10 ft lift, single speed: at 1/4 HP, model A at 1/8 ton and 32 FPM on one fall and model B at 1/4 ton and 16 FPM on one fall; at 1/2 HP, model C at 1/4 ton and 32 FPM on one fall, model F at 1/2 ton and 16 FPM on one fall and model H at 1 ton and 8 FPM on two falls; at 1 HP, model J at 1/2 ton and 32 FPM on one fall, model L at 1 ton and 16 FPM on one fall, model R at 2 tons and 8 FPM on two falls and model RT at 3 tons and 5.5 FPM on three falls. Weights with rigid hook suspension and chain container, given as a pair across two voltage codes: model F 61 and 65 lb, model H 72 and 73 lb, model L 113 and 110 lb, model R 131 and 130 lb, model RT 158 lb for both. Zinc plated load chain standard. Stated to meet ASME B30.16, to exceed H4 duty requirements, and to be inspected and tested to over 125% of rated load prior to shipment — Columbus McKinnon, Specifications for Hoists and Trolleys, cmco.com, read on 1 November 2026.
- MPT tower: maximum height 8.00 m; maximum loading capacity 1000 kg, stated to depend on tower height and size, the applied load, and how the tower base and top are restrained, with the Prolyte Blackbook cited for detail; maximum handwinch load 750 kg; mast section H30V; sleeve block suitable for 30 and 40 series truss on all four sides through bolted CCS6 couplers and for S36R or S36V truss through an adapter plate, and described as fully bolted rather than welded; coupling system CCS6; alloy EN-AW 6082 T6; self-weight 115 kg — Prolyte, MPT Tower product page, prolyte.com, read on 1 November 2026.
- ANSI E1.21-2023, Temporary Structures Used for Technical Production of Outdoor Entertainment Events, published by the Entertainment Services and Technology Association; supersedes the 2020 edition and is aligned to the 2024 International Building Code. Published abstract: establishes a minimum level of design and performance parameters for the design, manufacturing, use and maintenance of temporary ground-supported structures used in the production of outdoor entertainment events, and does not address fire safety and safe egress issues — Entertainment Services and Technology Association, ANSI E1.21-2023 published abstract, webstore.ansi.org, read on 1 November 2026.
- Arithmetic from the published figures above: a thirty-foot span is 360 inches, so L/180 allows two inches at mid-span; twenty of the 158 lb three-ton hoists total 3,160 lb, which is over a ton and a half — Division and multiplication only. The load tables, deflection criteria and hoist weights are the manufacturers’; the arithmetic is ours.