What it actually decides.
A rigging plot is the scaled drawing of everything suspended at an event. It shows each point in plan with a reference designation, the load at each point, the trim height each item hangs at, the venue’s own structural members and their capacities, and a datum — an agreed origin on the floor that every dimension is measured from, so that the crew in the building and the designer who drew it are describing the same place.
It is a working document, not paperwork. Without a datum, a plot is a picture; with one, a crew can mark the floor before anything goes up, which is the step that finds a conflict while it is still cheap.
The deadline is the part that surprises people. Large venues require the plot submitted for approval well in advance — commonly three to six weeks — and reserve the right to refuse a late submission outright. A show that finalises its video wall size the week before is a show whose plot cannot be approved in time, and the fallback is ground support at a cost nobody budgeted.
The plot is also where conflicts between departments surface: a lighting point in the same place as a loudspeaker hang, a motor over a camera platform, a truss at a trim height that cuts a projection beam. Finding those on a drawing is the whole purpose of drawing it.
We own this equipment.
Staging and rigging — owned inventory, our own crew, and a site survey before anything is specified.