From the Keys to Central Florida.
City pages carry the permit windows, the noise limits and the load-in hours. This page carries what the state decides: the route and the truck.
The counties we have written up run from Monroe at the bottom to St. Lucie and Indian River on the Treasure Coast, with Lee, Collier and Charlotte across on the Gulf side and Hendry and Okeechobee around the lake. The county index lists every city page and what each one publishes. The anchors are Fort Lauderdale, Miami, West Palm Beach, Fort Myers, Naples, Stuart and Key West.
North of that the work is a travel question, and the honest answer is that it is settled by the route rather than by the mileage. Orlando, Gainesville and the I-4 corridor are a day's drive and a different permit stack, and the stack is what decides whether the crew sleeps near the site or drives it. A date up there starts with the same two questions as a date in Broward — who signs, and when does the street have to be clear — and then adds the two below, which belong to the state and not to the city.
Concerts and festivals and municipal work are where this applies most often, because both put a build on ground with no building on it. The disciplines are worked in full elsewhere — staging and rigging, audio, lighting and video each have their own page.
A city closes its own street. A state road takes four signatures.
Chapter 14-65 of the Florida Administrative Code puts the temporary closing of a state road with the Department of Transportation, on its own form.
A great many of the streets a festival wants are state roads. US 1 through the Keys, Federal Highway up the coast, Okeechobee Boulevard, Tamiami Trail: the signage says city, the jurisdiction says Tallahassee. When the closure is on one of those, the city's special event permit is necessary and not sufficient.
The chapter is titled Temporary Closing and Special Use of State Roads. Rule 14-65.0035, Temporary Closing of State Roads for Special Events, took its current form on 25 June 2012; its rulemaking authority is sections 334.044(2) and 335.10, Florida Statutes, and it implements sections 316.003, 316.006(1), 316.008 and 337.406. Limited access roads are a separate rule — 14-65.0075, Special Events and Filming on Limited Access Facilities, new the same day, implementing section 337.406(1). An interstate is not the same ask as a surface state road and is not made on the same rule.
Four signatures, and one of them is not yours to get
The instrument is FDOT form 850-040-65, Temporary Closing of State Road Permit, filed under Rule 14-65.0035(1)(c). It carries four signature lines: the event coordinator, the law enforcement agency responsible for traffic control with a name and title, a government official with a name and title, and FDOT's own authorization. Above them the form asks separately for the governmental entity and for the approving local government's contact, both distinct from the requesting organization.
So the producer does not file this alone. The city has to be inside the form before the state looks at it, the police agency has to have agreed to work the closure, and FDOT signs last. Each of those is a different office with a different calendar, which is the practical reason a state road moves the whole booking horizon out rather than adding a week to it.
The field most people have never seen
One field asks whether Coast Guard approval applies for controlling a movable bridge, and offers two answers: not applicable, or a copy of the USCG approval letter attached. Florida has more drawbridges than any planner expects, and a waterfront route that holds one open or closed for a parade or a finish line brings in a federal agency on top of the city, the police and the state.
The rest of the form is the part a production actually builds to. The event route and the detour route are each submitted as an attached map. The permittee assumes all risk and indemnifies, defends and saves harmless the State of Florida and FDOT. And the permittee maintains the portion of the road it occupies for the duration of the event, free of litter and providing a safe environment to the public — a line that is a crew, a schedule and a strike plan, not a formality.
Note what the form does not say: it states no lead time at all. The clock on a state road closure is borrowed from whoever the approving local government is, which is why the dates live on the city pages and not on this one. What a traffic plan has to contain changes city by city as well.
Sources, each from the publisher's own pages: Chapter 14-65 and Rules 14-65.0035 and 14-65.0075, Florida Administrative Code, with their rulemaking authorities and histories as published on flrules.org; and Florida Department of Transportation form 850-040-65, Temporary Closing of State Road Permit, as filed there under Rule 14-65.0035(1)(c). Read 11 November 2026.
The trailer has a legal size, and a roof system does not care.
Section 316.515 of the Florida Statutes sets the width, the height and the length of anything on a Florida road, load included.
A statewide show is a convoy before it is a build, and the convoy has published limits. The total outside width of a vehicle or the load on it may not exceed 102 inches. Height, including the load, is 13 feet 6 inches, with automobile transporters allowed 14. Length applies to the semitrailer or trailer rather than to the tractor or to the combination: 40 feet for a straight truck, 68 feet for a truck-trailer combination including load, 48 feet for a semitrailer in a tractor-semitrailer combination, and 28 feet for each unit of a tandem.
The 48 goes to 57 under one condition the statute spells out — a kingpin-to-rear-axle distance of 41 feet or less, and rear underride protection on the unit. That pair of numbers is worth knowing before a trailer is hired, because the longer deck is available only on a chassis built to the shorter wheelbase.
The width limit has a second half that catches routing rather than loading. A vehicle over 96 inches may be kept off any road that lacks a 12-foot through lane in each direction, or off any road the department judges unsafe for a wider vehicle. Ninety-six inches is under the 102 the same section allows, so a load that is legal on width can still be illegal on the lane it was going to use. On the Keys, on a barrier island, or on a two-lane county road into a fairground, that is the sentence that reroutes the truck.
What it means on a site: a stage trailer that opens into a deck far wider than its travel width is engineered to arrive inside those figures, and a truss roof, a generator, a distro and a video wall are several loads rather than one. The build order on the ground is set by the order the trucks can legally arrive in, and that order is a routing decision taken weeks earlier.
Source: section 316.515, Florida Statutes, as published by the Florida Legislature — subsection (1) on width, (2) on height, (3)(a), (3)(b)1, (3)(b)2 and (3)(c)1 on length. Read 11 November 2026.
Over the limit is a permit, not a refusal.
Section 316.550 lets the Department of Transportation, or a local authority on its own highways, permit a vehicle that exceeds those limits.
The permit is discretionary and it is granted on application for good cause. It describes the vehicle, the load and the highways it covers. The issuing authority may limit it, may attach operating conditions, and may require a bond or other security against damage to the road. Blanket permits run up to 36 months. An off-interstate permit for a commercial vehicle has to be issued within 14 days of the request, and the designated route must avoid any bridge the department determines cannot safely carry the load.
Two subsections matter on the night rather than in the office. The permit is carried in the vehicle and is open to inspection by a police officer or an authorized agent, so a cab without the paperwork is a stopped truck. And violating a special condition declared on the permit voids it for that vehicle, at which point the ordinary limits of section 316.515 apply again — a driver improvising around a closed ramp can put a legal load back over the line halfway through the move.
What FDOT publishes about getting one
The department's permit office lists annual blanket permits, annual vehicle-specific blanket permits, ten-day trip permits and three-month route-specific blanket permits; the last two require a defined route submitted with the request. Through FDOT's Permit Application System a customer can self-issue trip permits up to 16 feet wide, 18 feet high, 150 feet long and 200,000 pounds, and up to 140,000 pounds for self-propelled equipment, with no interaction with the permit office at all. Above those figures a person has to be involved.
The office works Monday to Friday, 8:00 AM to 5:00 PM, and stopped operating on Saturdays on 1 January 2024. A touring schedule that plans to solve a dimensional problem on a Saturday morning has no state counterparty to solve it with, which makes Friday the real deadline on a weekend load-in.
The conditions a permitted move runs under — hours, escorts, weekends and holidays — sit in their own chapter, 14-26 of the Florida Administrative Code, titled Safety Regulations and Permit Fees for Overweight and Overdimensional Vehicles. Rule 14-26.012, Movement Conditions and Restrictions, was last amended on 1 February 2010 under rulemaking authority of sections 316.515, 316.550 and 334.044(2), Florida Statutes. Read it alongside the permit before a route is committed, because a permit that authorizes the load does not by itself authorize the hour.
Sources, each from the publisher's own pages: section 316.550, Florida Statutes, as published by the Florida Legislature — subsections (2), (4)(a), (4)(b), (6), (7) and (10)(d); the Florida Department of Transportation's over-weight over-dimension permits page; and Chapter 14-26 and Rule 14-26.012, Florida Administrative Code, with their titles, histories and rulemaking authorities as published on flrules.org. Read 11 November 2026.
The longest clock in the stack sets the date.
A statewide date has more consenting parties than a city date, and they do not share a calendar. The city issues the special event permit. The police agency agrees to work the closure. The state signs the road. A movable bridge brings in the Coast Guard. The permit office clears the truck. Whichever of those has the longest queue is the one that decides when the show has to be real, and it is rarely the one the client is worried about.
So the first conversation about a date up or across the state is about which of these is in the path. Tell us the city and the site, and whether the ground is public, and we will tell you which signatures the date depends on and what order they have to come in. Where the city's own numbers decide it, they are on that city's page.